• CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
  • CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
  • CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
  • CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
  • CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
  • CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition

CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition

After-sales Service: Feild Maintenance
Warranty: One Year Warranty
Type: Pressure Pile Driver
Pressure Pile Driver Type: Hydraulic Pile Driver
Pile Hammer Type: Hydraulic Hammer
Power Source: Diesel
Customization:
Gold Member Since 2023

Suppliers with verified business licenses

Fujian, China
to see all verified strength labels (9)
  • Overview
  • Product Description
  • Projects show
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
CF30
Motor Power
250p
Noise
Without Noise
Certification
CE, ISO 9001:2000, ISO 9001:2008
Condition
New
Max Strike Energy
468kn.M
Strike Frequency (Max/Min)
80/30bpm
RAM Weight
30000kg
Max Stroke
1500mm
Transport Package
Export Standard Package
Trademark
CF
Origin
China
HS Code
8430100000
Production Capacity
500sets/Year

Product Description

Product Description

1. hydraulic impact hammer are suitablefor the following applications
·Precast concrete piles
·Steel casing piles
·Steelprofiles(H and U beams)
·Round piles
·Square piles
·Steel and concrete sheet piles
·Combined sheet pile walls
·Cast-in-situ concrete piles


2. Various sites are applicable

CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
3.Product Features
· Modular configuration design
· High energy efficiency 
· Noise reduction 
· Easy operation

 
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
4. Technical Parameter Table
 
Model Unit  HKC
 4
HKC
 5
HKC
 8
HKC
 10
HKC
 12
HKC
 14
HKC
 16
HKC
 18
HKC
 20
HKC
 25
HKC
 30
HKC
 35
HKC
 40
HKC
 50
HKC
60
MAX.STRIKE ENERGY KN.M 50 65 128 158 188 220 245 280 316 380 468 540 625 760 936
MAX.STROKE OFHAMMER MM 1200 1200 1500 1500 1500 1500 1500 1500 15000 1500 1500 1500 1500 1500 1500
STRIKE FREQUENCY(MAXIMIN) BPM 90/36 90/36 90/36 90/36 90/36 90/36 90/30 90/30 90/30 90/30 80/30 80/28 80/28 80/28 80/28
RAM WEIGHT KG 4000 5000 8000 10000 12000 14000 16000 18000 2000 25000 30000 35000 40000 50000 60000
LIFTING HYDRAULICCYLINDER                                            SINGLELIFTING HYDRAULIC CYLINDER
HEIGHT OF HAMMER(WIO PILE CAP) MM 4826 5136 6600 7330 7470 7470 7525 7830 8800 8120 8390 10180 10620 11450 9175
HORIZONTAL WIDTH OF HAMMER MM 885 950 1130 1140 1140 1228 1273 1320 150 1580 1525 2235 2235 2280 2840
VERTICAL WIDTH OFHAMMER MM 1340 1275 1385 1390 1380 1460 1550 1580 1680 2070 1745 2795 2795 2795 3475
DISTANCE BETWEEN CENTEROF HAMMER AND GUIDES MM 696 755 740 745 745 790 835 865 865 1188 942 1555 1555 1555 1850
DISTANCE BETWEENCENTER OF GUIDES MM 600 600 600 600 600 600 600 600 600   
HAMMER WEIGHT(WIO PILE CAP) KG 7100 8290 13100 16720 18500 21600 23950 27100 29800 42600 49925 58000 63100 74900 92200
TRIP GEAR WEIGHT KG 420 420 610 645 645 645 733 733 733  
 
Projects show
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
Company Profile

Quanzhou Chengfeng Transmission Machinery Technology Co.,Ltd  is a high-tech enterprisefocusing on research anodevelopment,production,sales and after-sales of piling equipment. We provide HKC serieshydraulic impact hammer ,CF series hydraulic vibratory hammer, Walking pile frame,crawlerpile frame etc. Our products are widely used in construction of buildings,road,bridge,waterconservancy,dock etc.

After years of experience in produce piling equipment,we have obtained 10 patentsespecially in hydraulic impact hammer and hydraulic vibratory hammer.And We havesuccessfully participated in dozens of the pile foundation construction of national projectssuch as Henan Expressway project, Ningbo railway project, Fuzhou public apartment projectect.
We believe quality is the foundation of our business. We guarantee that our products arecarefully inspected by our experienced staffs during production and before delivery.We act to the best reliable and trustable partner of our customers and strive to fulfill theirrequirements not only in good quality but also in competitive price,We promise to provide thebest after-service for all customers, We take pride in building long-term relationships withour customers,partners, and employees

 

CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition
CF30 Foundation Pile Machinery Hydraulic Impact Hammer for Hard Soil Condition

 

FAQ

1. Q:How to choose the sutable hammer model?

A: When asking about the product, you can provide some relevant construction information, such as pile diameter, thickness, geological analysis report and so on. Our technicians will make the relevant plan and select the suitable hammer according to the information.

2. Q:I have a special construction environment and pile type. Is Yongan able to customize products for me?
Our R & D and production capacity is very excellent, as long as customers can put forward specific needs, Yongan R & D staff will do their best to create satisfactory customized products for them.

3. Q: How to provide after-sales service?
After the product is issued, we will have professional technicians to go to the customer's construction site. If customers encounter obstacles in the process of using the product, our engineers will provide the appropriate solution within 24 hours. In addition, our technicians will not leave the site at will before the completion of the client's project.

4. Q: How about delivery time?

The default delivery time for general pile equipment is 35 days.

 





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Gold Member Since 2023

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Management System Certification
ISO 9001, IATF16949